NOW LEASING Flagship 8,00,000+ Sq. Ft. Grade-A Warehouse Park in Haryana & Punjab • 100% Govt. Approved

Custom-Tailored Built-to-Suit (BTS) Warehouses

Engineered to your enterprise supply chain SOPs. From custom clear heights and high-point-load VDF Trimix flooring to pharmaceutical PUF cold storage, DHDL India delivers bespoke industrial infrastructure on fast-track schedules.

Why Settle for Speculative When You Can Build to Exact Fit?

With ready land banks across Haryana and Punjab, in-house structural engineering, and fast-track statutory clearances, we turn your operational blueprint into reality in 4 to 8 months.

1

Custom Clear Heights (Up to 14m)

Maximize cubic volume and vertical pallet positions with customized column grids tailored for high-reach forklifts and VNA equipment.

2

Engineered 9T/sqm VDF Trimix Floors

Heavy point-load and uniformly distributed load resistance with FM2-level flatness for AGVs, heavy automated sorters, and heavy machinery.

3

PUF Cold Storage & Cleanrooms

Pharma-grade temperature-controlled zones (-25°C deep freeze, 2°C to 8°C chilled, or 15°C to 25°C ambient) with PUF insulation paneling.

4

Cross-Docking & Trailer Turning Aprons

Double-sided loading bays, customized hydraulic dock levelers, and 40m+ deep aprons for continuous logistics velocity.

Interactive BTS Studio

Custom Configurator
Required Covered Area 1,50,000 Sq. Ft.
Select Your Sector / Storage Type
Clear Ceiling Height
Key Custom Features

Estimated BTS Specsheet

DHDL Fast-Track
Gross Footprint 1,50,000 Sq. Ft.
Recommended Docks 12 Dock Bays (Double-Sided)
Floor Specification 9 Tonnes/Sq.m (VDF Trimix)
Turnaround Timeline 5-6 Months Fast-Track
Insulation & Climate Included (Temperature Controlled)

Our Proven 4-Step BTS Delivery Lifecycle

01

Requirement & Architectural Scoping

We work with your supply chain and industrial engineering teams to map exact pallet storage densities, cross-docking frequency, and loading ergonomics.

02

100% Statutory & CLU Clearances

DHDL handles all Change of Land Use sanctions, municipal approvals, environmental consents, and building clearances with zero administrative delay.

03

High-Speed Grade-A PEB Construction

Fabrication of heavy-duty PEB structural steel frames, high-load VDF Trimix floors, NFPA fire piping, and insulated PUF paneling.

04

Testing, Commissioning & Handover

Fire safety system live testing, electrical substation commissioning, dock leveler load testing, and keys handed over for tenant fit-out.

DHDL Built-To-Suit vs Standard Speculative Warehouses

See why India’s tier-1 supply chains choose custom BTS over compromised pre-existing warehouses.

Evaluation Parameter DHDL Built-to-Suit (BTS) Facility Generic Speculative Warehouse
Floor Load Capacity 9 Tonnes / Sq.m VDF Trimix (customizable up to 12T) Typically limited to 4 - 5 Tonnes / Sq.m
Clear Height & Volume 12m to 14m clear height for 5–6 pallet tiers Generic 8m - 10m height with wasted roof space
Truck Docking Ratio Double-sided cross-docking tailored to daily truck turns Single-sided fixed docks causing yard bottlenecks
Temperature Control Pre-installed PUF panels & dedicated compressor plant zones Expensive retrofitting required with insulation loss
Statutory Compliance 100% CLU, Fire NOC, & Stability Approved Often riddled with agricultural land disputes & pending NOCs

Let’s Design Your Custom Built-To-Suit Campus

Reach out to our engineering and leasing leadership to review available land parcels across Haryana and Punjab.

Submit BTS Request for Proposal Call BTS Director